Revamping a Fan in Mexico: Performance Up, Costs Down

2021-05-10T14:34:27+00:00

Products: Fans, Services & Retrofits
Industry: Cement & Lime
Location: Tepetzingo, Mexico

In 2016, Boldrocchi was awarded a contract to revamp a kiln fan at Cementos Moctezuma’s Tepetzingo plant. Plant officials were looking for a major performance increase but had a limited budget. Our kiln fan revamp increased the fan’s performance by 40% while saving 30% in costs. To further reduce costs, we designed a partial casing replacement to […]

Revamping a Fan in Mexico: Performance Up, Costs Down2021-05-10T14:34:27+00:00

Engineering 9 ACHEs for a Complex O&G Project in Kazakhstan

2021-05-10T14:35:11+00:00

Products: Air Cooled Heat Exchangers (ACHE)
Industry: Oil & Gas
Location: Chinarevskoye Field, Kazakhstan

Boldrocchi designed, manufactured, inspected & tested nine (9) high performance air cooled heat exchangers (ACHE) solutions for a complex project in Kazakhstan and delivered all products in an impressive 11-months. The quick turnaround for Nostrum Oil & Gas’s Chinarevskoye field project occured despite several challenges: the ACHEs had to be light enough to be mounted […]

Engineering 9 ACHEs for a Complex O&G Project in Kazakhstan2021-05-10T14:35:11+00:00

The Highest Capacity Transformer Coolers Ever Realized for an Aluminum Smelter in Canada

2021-05-10T14:35:46+00:00

Products: Heat Exchangers & Coolers, Electrical Machine Cooling
Industry: Iron, Steel & Non-Ferrous Metals
Location: Bécancours, Canada

Boldrocchi was the only company up to the challenge of engineering and manufacturing 10 enormous transformer coolers for an aluminum smelter in Quebec, Canada. Indeed, the 10 coolers had capacities of 800 kW each with very low oil operating temperatures and represent the highest capacity transformer coolers ever realized. Tamini, an Italian […]

The Highest Capacity Transformer Coolers Ever Realized for an Aluminum Smelter in Canada2021-05-10T14:35:46+00:00

Delivering Diverter Damper Systems to Nigeria Within a Mere 4 Months

2021-05-10T14:37:09+00:00

Products: Heavy-Duty Process Dampers
Industry: Oil & Gas
Location: Lekki, Nigeria

In 2016, Boldrocchi was awarded a contract to supply eight (8) diverter damper systems for six GE gas turbines, to be installed at the Dangote Refinery in Lekki, Nigeria. The goals: achieve reduced wear & extended operational life. Thanks to our large in-house facilities, all 8 were assembled at once. They were then tested in-house in the presence […]

Delivering Diverter Damper Systems to Nigeria Within a Mere 4 Months2021-05-10T14:37:09+00:00

Boldrocchi Completes High Temperature Filtration Project using Ceramic Candle Filters

2021-05-10T14:37:40+00:00

Products: Air Pollution Control, Dust Removal
Industry: Power, Waste-to-Energy & Biomass
Location: Jazan, Saudi Arabia

Boldrocchi designed and provided 8 ceramic candle filters with cyclones to the Jazan Integrated Gasification Combined Cycle plant in Saudi Arabia. High temperature filtration using ceramic candles was chosen due to the high temperature of the flue gas (over 250°C). Boldrocchi is one of the few companies in the world with experience implementing ceramic […]

Boldrocchi Completes High Temperature Filtration Project using Ceramic Candle Filters2021-05-10T14:37:40+00:00

Boldrocchi Customizes a Cooling System for a Large Motor at the World’s First LNG Plant to use Combined-Cycle Technology

2021-05-10T14:38:32+00:00

Products: Heat Exchangers & Coolers, Electrical Machine Cooling
Industry: Oil & Gas
Location: Darwin, Australia

Boldrocchi engineered and manufactured an air-to-water cooling system for a large motor at an LNG Project near Darwin, Australia. Boldrocchi designed & manufactured all parts of the cooling system with a power to dissipate of 600 Kw: the heat exchanger, tubes, fans, circulating pump & electrical devices. Our in-house facilities allowed us to undertake […]

Boldrocchi Customizes a Cooling System for a Large Motor at the World’s First LNG Plant to use Combined-Cycle Technology2021-05-10T14:38:32+00:00

SNCR Used in Cement Kiln to Reduce NOx in Italy

2021-05-10T14:39:15+00:00

Products: Air Pollution Control, Flue Gas Treatment
Industry: Cement & Lime
Location: Isola delle Femmine, Italy

Boldrocchi succeeded in obtaining impressive NOX reduction rates by using Selective Non-Catalytic Reduction (SNCR) in a Lepol cement kiln at the Isola delle Femmine plant. We were able to reduce NOX to 350 mg/Nm3, translating into an efficiency of > 60%, rivaling the best abatement possible with SNCR. The injection point was chosen […]

SNCR Used in Cement Kiln to Reduce NOx in Italy2021-05-10T14:39:15+00:00

Boldrocchi Builds Special Test Facility for Turkish Order of Multiple Blowers

2021-05-10T14:40:02+00:00

Products: Fans
Industry: Oil & Gas
Location: İzmir, Turkey

Boldrocchi engineered and manufactured a number of systems for a refinery in Izmir, Turkey. Among the systems: a CCR Chlorination Blower used in petrochemical chlorination and catalyst regeneration processes. In order to satisfy the process requirements, Boldrocchi built a special test facility to check the blower’s performance at various temperatures, up to 600°C (1112°F). Boldrocchi also designed and fabricated a cooler […]

Boldrocchi Builds Special Test Facility for Turkish Order of Multiple Blowers2021-05-10T14:40:02+00:00

Complete APC & Noise Protection for Biomass Plant in Italy

2021-05-10T14:40:55+00:00

Products: Air Pollution Control, Dust Removal, Flue Gas Treatment, Noise Protection
Industry: Power, Waste-to-Energy & Biomass
Location: Pavia, Italy

Boldrocchi provided complete air pollution control and noise protection solutions for a biomass plant near Milan, Italy. Analyses show complete success: air pollutants have been removed to well under area limits and noise is nearly completely eradicated – the plant’s noise emissions are lower than any other biomass […]

Complete APC & Noise Protection for Biomass Plant in Italy2021-05-10T14:40:55+00:00